<cite id="dxp1n"><span id="dxp1n"><var id="dxp1n"></var></span></cite>
<strike id="dxp1n"><noframes id="dxp1n"><ruby id="dxp1n"></ruby>
<ruby id="dxp1n"></ruby>
<span id="dxp1n"><dl id="dxp1n"></dl></span>
<span id="dxp1n"></span>
<strike id="dxp1n"></strike>
<span id="dxp1n"><dl id="dxp1n"><ruby id="dxp1n"></ruby></dl></span>
<strike id="dxp1n"></strike><span id="dxp1n"></span><strike id="dxp1n"><dl id="dxp1n"></dl></strike>
<span id="dxp1n"><dl id="dxp1n"></dl></span>
<span id="dxp1n"><video id="dxp1n"><ruby id="dxp1n"></ruby></video></span>
<span id="dxp1n"><video id="dxp1n"></video></span>
<span id="dxp1n"><dl id="dxp1n"></dl></span> <strike id="dxp1n"><i id="dxp1n"><del id="dxp1n"></del></i></strike><strike id="dxp1n"></strike>
<span id="dxp1n"></span>
<span id="dxp1n"></span>
<strike id="dxp1n"><i id="dxp1n"><cite id="dxp1n"></cite></i></strike>
<span id="dxp1n"></span><span id="dxp1n"><dl id="dxp1n"><ruby id="dxp1n"></ruby></dl></span>
沖擊式壓路機logo圖
沖擊式壓路機logo圖

主頁 > 新聞中心 > 公司新聞 >

拖式沖擊壓路機施工順序

2021-05-25 16:58 導讀:拖式沖擊壓路機是一種非圓形的沖擊碾壓設備,通過三邊形輪的沖擊,連續對土、石材料進行靜壓、揉搓、沖擊的周期性作業。但我們在施工前應做好哪些準備工作呢? 1.施工前應熟悉 ...
  拖式沖擊壓路機是一種非圓形的沖擊碾壓設備,通過三邊形輪的沖擊,連續對土、石材料進行靜壓、揉搓、沖擊的周期性作業。但我們在施工前應做好哪些準備工作呢?
 
  1.施工前應熟悉設計文件、招標技術規范,選擇適合項目要求的拖式沖擊壓路機機型。
 
  2.正式施工前,在熟悉設計文件及技術規范的基礎上,應對采用沖擊碾壓的路段進行現場核對調查,以確認沖壓面積、地形等是否滿足要求,對不符合現實的向監理人提出修改意見。
 
  3.施工前應根據工程量的大小和施工周期計劃,合理安排拖式沖擊壓路機的數量。
 
  4.施工前應收集和熟悉有關施工圖、工程地質報告、土工試驗報告和地下埋設管線、構造物等基礎資料。
 
  5.施工前應根據現場收集到的情況、核實工程數量,按工期要求、施工難易程度、當地地理環境等編制施工組織設計方案,報駐地監理工程師批準,并履行首件工程開工報告。
 
  6.沖擊碾壓施工現場應配備相應的試驗檢測儀器設備,事前對各種儀器設備事先做好調試校核,確保其可靠實用。
 
  7.沖擊碾壓施工現場必須配備必要的平地機、推土機、振動壓路機和灑水車。
 
  8.當施工場地的長度滿足要求,而寬度小于拖式沖擊壓路機轉彎直徑(自行式為8m,膠輪牽引式為12m,履帶牽引式為16m)時,應在施工場地的單側設置必要的轉彎場地,轉彎場地的寬度應大于所選用的拖式沖擊壓路機的轉彎直徑,保證壓路機的轉向調頭,轉彎場地應設于拓寬路基的外側,且不能影響沖擊壓實區的碾壓。
 
  9.按《公路路基施工技術規范》的要求做好導線、中線、水準點復測,橫斷面檢測與補測,增設水準點等,并按設計文件要求定出路堤坡腳、護坡道及邊溝等具體位置,以便清理現場和施工。水準點離沖壓區的距離不小于30m,以防受到震動影響。
 
  10.上道工序檢查(即基面處理)
  